Design, manufacture and install 97,000sq ft two-tier mezzanine in a live environment




The Challenge
Bleckmann Logistics came to Oracle storage with the challenge to more than doubling their storage capacity. On top of that we needed to develop a project plan would that enable them to still operate in the building, including over the Black Friday sale period.




The Solution
We designed, manufactured and installed the mezzanine in two phases, this enabled Bleckmann to continue operating during the build. We handed over 50% of the mezzanine floor, enabling Bleckmann to relocate onto the new floor, before we then completed the final 50%. This was a complex project that we delivered in partnership with Green Sky Contract Services, including full site setup (CDM), electrics, 60-min fire rating and lift.
“This mezzanine is one of the best I’ve ever seen and is already our showcase site to our potential new customers. The project was delivered on time and under budget, fantastic service.”
Products Used
Discuss your industrial mezzanine flooring project today
The Results
The warehouse now has an additional 97,000sq ft of available floor space for storage. It’s enabled Bleckmann to sign up new customers as they continue to grow their UK operation.